Kitchen Remodel Timeline: How Long Does It Take?

A kitchen remodel takes 1 to 3 weeks for a cosmetic update, 6 to 13 weeks for a typical remodel and 3 to 8 months or more when the job includes structural changes, relocated lines or custom cabinets. These ranges are based on Fixr's national figures. Scope, cabinet lead times and permits decide where your project falls.

By Isaac (Owner), Imperial FinishesLast updated Data: Fixr

Kitchen with white cabinets, a peninsula with a sink, dark wood floor and an exposed wood beam

Kitchen remodel timeline by scope

The ranges below come from Fixr, with one week added to the upper end of each range. They are national figures, not Imperial Finishes schedules.

Typical kitchen remodel timelines by scope
ScopeWhat it coversTypical time
Cosmetic updateCabinet refacing or painting, new fixtures1 to 3 weeks
Typical remodelNew cabinets, appliances and flooring6 to 13 weeks
Major remodelStructural changes, relocated lines or custom cabinets3 to 8 months or more

Source: Fixr, “How Long Does a Kitchen Remodel Take?”, by Dan Simms, . National figures. One week is added to the upper end of each range.

Typical timelines, not a guarantee. Actual timing depends on scope, materials, permits and the conditions found during the work.

The 6 to 12 week range does not include planning. Design, selections and ordering happen before that clock starts.

What happens before construction starts

Two waits come before demolition: permits and cabinets. Fixr says permit approval can take a week or two, or longer depending on the city. Permit requirements vary by city. Cabinet delivery depends on the kind of cabinet you order.

Cabinet delivery times (Fixr)
Cabinet typeDelivery time
Stock cabinets1 to 2 weeks
Semi-custom cabinets4 to 8 weeks
Custom cabinets3 to 6 months or more

Source: Fixr, “How Long Does a Kitchen Remodel Take?”, by Dan Simms, . National figures.

Typical timelines, not a guarantee. Actual timing depends on scope, materials, permits and the conditions found during the work.

This is why demolition should not start the day the contract is signed. In most kitchens it starts when the cabinets have a delivery date.

The order of a kitchen remodel

The phases follow the same sequence in most kitchens. A cosmetic update skips several of them.

  1. Planning, layout and selections

    Scope, budget, layout, cabinets, countertops, appliances and fixtures are decided and ordered.

  2. Agreement and permits

    The scope is put in writing and permits are applied for where the city requires them.

  3. Demolition

    A temporary kitchen is set up and the old cabinets, counters and flooring come out.

  4. Framing and rough-ins

    Walls change if the design calls for it. Plumbing, electrical and ventilation are run in the open walls.

  5. Drywall, flooring and cabinets

    Walls are closed and finished, then flooring and cabinets are installed.

  6. Countertops

    Countertops are measured after the cabinets are in place, then fabricated and installed.

  7. Finishes and walkthrough

    Backsplash, final connections, appliances, paint and hardware, then a list of last corrections.

The same phases are explained with the decisions you make in each one on the kitchen remodeling process section of our main page.

What makes a kitchen remodel take longer

  • Design changes after work has started.
  • Long lead times or backorders on cabinets, countertops and appliances.
  • Hidden conditions found at demolition, such as water damage or old wiring.
  • Waiting for inspections where a permit applies.
  • Scheduling between trades that must work in sequence.

“Delays are common in remodeling projects. Build some flexibility into your timeline and budget to account for unforeseen issues.”

This Old House, “The (Don’t Get Burned) Kitchen Remodeling Guide”

How to plan around the timeline

  • Make every selection before demolition. Each open decision is a possible pause.
  • Order cabinets and appliances early and schedule demolition around their delivery.
  • Ask your city what needs a permit before you set a start date.
  • Set up a temporary kitchen with the refrigerator, a microwave and a place to wash dishes.
  • Avoid hard deadlines such as holidays; leave a margin at the end.

A shorter project is usually a smaller one. If the cabinets are sound, professional cabinet painting keeps the job in the cosmetic range. A longer project also costs more: see the kitchen remodel budget by project type.

Talk through your schedule

Every kitchen has its own timeline. Imperial Finishes handles kitchen remodeling in the Kansas City metro from its base in Overland Park, KS. Send the estimate form and tell us when you would like the work done.

Planning a date for your kitchen?

Tell us your scope and when you would like to start. The estimate is free.

Call +1 (913) 203-8419Get a Free Estimate

Mon–Sat 8 AM–6 PM · Free estimate

Get a free kitchen estimate

Tell us the size of the kitchen, what you want to change and which city the home is in.

Call +1 (913) 203-8419

Mon–Sat 8 AM–6 PM · English & Spanish

Let’s Discuss Your Project

CallFree Estimate